The first park incorporates a capability of 200 MW while Sandrini II includes a capacity of a hundred MW. The whole expense of the two jobs weren't disclosed having said that, throughout construction, over 200 employees were being used. The initiatives are anticipated to view a handful of positions opening https://teslasolarfresnoca.blogspot.com/2024/10/how-to-select-best-solar-panel.html