Set up the Coir Matting during the trench. Area at the least twelve inches with the roll previously mentioned the trench (more up the slope). House each staple a few foot apart inside the trench Positioning: Spot the coir logs with the waterline or along the edge with the eroded https://damienalpag.blogacep.com/39246510/5-easy-facts-about-coir-mat-described