But what about the heat introduced for the duration of clinker cooling or even the drying procedures? Industry studies estimate that nearly 40% of all Strength inputs in cement manufacturing are wasted via heat decline, generally as a result of out-of-date cooling devices and badly insulated kilns. Numerous technologies are https://purethermal.co.uk/media-news/november-launch-waste-heat-recycling-design-support-service-from-pure-thermal-and-oilon/